225KWh stackable lifepo4 battery project in Belgium
Mr. Leenaerts needs 225KWh stacked lithium batteries in Belgium . It takes us 20 days production and about 60 shipping days. After installed, the project save about $11,250 annully for Leenaerts.
Customer Case 2
3MWh 1500KW BESS project in Philippines
Mr. Christian needs 1500KW 3028KWh BESS in Philippines. It takes us 40 days production and about 15 shipping days. After installed, the project save about $151,400 annully for Christian.
Customer Case 3
1160KWh High-Voltage Battery project in Argentina
Mr. Jose needs 1160KWh lithium batery in Argentina. It takes us 20 days production and about 60 shipping days. After installed, the project save about $580,000 annully for Jose.
Customer Case 4
180KWh Powerwall Battery project in Croatia
Mr. Boric needs 180KWh energy storage system in Croatia. It takes us 20 days production and about 50 shipping days. After installed, the project save about $9,000 annully for Boric.
Customer Case 5
2MWh 500KW C&I Energy Storage System project in Netherlands
Mr. Manuel needs 500KW 2096KWh(2MWh) BESS in Netherlands.It takes us 40 days production and about 60 shipping days. After installed, the project save about $104,800 annully for Manuel.
Customer Case 6
215KWh EV Charger Energy Storage project in Korea
Mr. 유승훈 needs 215KWh BESS in South Korea. It takes us 20 days production and about 20 shipping days. After installed, the project save about $10,750 annully for 유승훈.
Customer Case 7
500KWh Rack-mounted Lithium Battery project in Lithuania
Mr. Tomas needs 500KWh lithium batteries in Lithuania.It takes us 20 days production and about 60 shipping days. After installed, the project save about $25,000 annully for Tomas.
Customer Case 8
5MWh Business Storage project in Denmark
Mr. Jens-Ole needs 5MWh lithium batteries in Denmark.It takes us 40 days production and about 60 shipping days. After installed, the project save about $250,000 annully for Jens-Ole
Customer Case 9
1MWh Industrial & Commercial Energy Storage System project in vietnam
Mr. Ha needs 500KW 1164.8KWh (1MWh) liquid cooling BESS in Vietnam.It takes us 40 days production and about 15 shipping days. After installed, the project save about $58,240 annully for Mr. Ha.
Customer Case 10
10MWh Industrial & Commercial Microgrid Solutions project in Hungary
Mr. Jimi needs 10MWh BESS in Hungary. It takes us 40 days production and about 60 shipping days. After installed, the project save about $500,000 annully for Mr. Jimi.